arcneo GmbH, Berlin. Efficient residential construction with timber modules.

Prefabricated timber module hanging from a crane against a blue sky

Real Estate

We build multi-family houses from timber modules

A proven house type, prefabricated in series and assembled on site. Uniform modules lower construction costs and make residential construction predictable.

Our projects benefit from economies of scale: high volumes, uniform modules and clear standards for affordable housing.

View the bond

The concept

One house, serial by design

High volumes, uniform modules and clear standards lower construction costs and make affordable housing possible.

The arcneo standard house type is a multi-family house with three to six storeys built from prefabricated solid wood modules. A high degree of standardisation reduces complexity in planning and construction and makes economically viable projects with short construction times possible.

The modules are made in the factory, delivered to the construction site and assembled there into a closed building envelope. Fewer trades on the construction site mean predictable processes and a reliable construction time.

4-storey multi-family house with a timber facade and balconies
3to6

Storeys per multi-family house

8to14months

Construction time per project

Solid wood

Prefabricated modules from the factory

Serial

Pre-production of all building elements

Age-friendly

Floor plans for all generations

Few trades

Low operational risk on the construction site

Interview1:45

In conversation

It’s not just about housing, it’s about a living environment.

Volker BredlerReal Estate Team, previously four decades of site development at Aldi Süd

All interviews

Personal view of the person quoted, quote from the interview.

In conversation

The arcneo house is built with very few partners.

Jens BredlerFounder and CEO, project development in the second generation

All interviews

Personal view of the person quoted, quote from the interview.

Interview1:14

From element to house

From wall element to multi-family house

Uniform modules, manufactured in series and assembled into a house on the construction site. Four stages, shown schematically.

01Stage 01 / Wall element

Solid wood elements

Walls, ceilings and floors are made as prefabricated solid wood elements, in the factory hall and independent of the weather.

02Stage 02 / Module

One module, manufactured in series

In the factory, the elements are joined into volumetric modules. Materials, processes and assembly steps are optimised and proven.

03Stage 03 / Storey

Modules become a storey

On the construction site, the crane sets the modules side by side. Within a few days, a whole storey is in place.

04Stage 04 / House

A multi-family house in months

Storey by storey, the house takes shape. Roof, facade and interior finishing follow. The construction time is 8 to 14 months.

GF1F2F3F

Manufacturing in the factory

Precision from the factory hall

The 2D and 3D timber modules are produced by industrial prefabrication. Production, on-schedule delivery and assembly on the construction site start once financing is in place.

Through industrial prefabrication, we reduce the number of trades on the construction site and with it the operational risk.

  • Serial pre-production of all building elements
  • Low planning effort thanks to a proven house type
  • Fewer trades and interfaces on site
Aisle through a factory hall for timber prefabrication with workbenches and a gantry crane
Prefabrication in the factory hall: uniform modules, manufactured in series.

In conversation

The more interfaces you have in the project, the higher the risk to execution and feasibility.

Peter Paul PratterProject developer and shareholder, over 90 projects in more than 30 countries

Personal view of the person quoted, quote from the interview.

Interview0:45

Standards

Built efficiently, lived in efficiently

Our buildings meet the KfW Efficiency House 40 standard and are designed for QNG certification. Compared with concrete buildings, solid wood modules save a considerable amount of CO₂ and reduce grey energy.

EH40

KfW Efficiency House 40 standard

QNG

Certification of the buildings

8to14months

Construction time per project

-70% CO₂

Measurable ESG criterion of the construction method

In conversation

We simply have the problem that the highest CO₂ emissions come from construction.

Jakob WeigeleFamily office ALPHAOMEGA AG, investor and partner of arcneo

All interviews

Personal view of the person quoted, quote from the interview.

Interview1:39

Factory and assembly

From the factory to the construction site

Industrially prefabricated and assembled on site. This reduces the number of trades on the construction site and makes construction times of 8 to 14 months possible.

Manufacturing in the factory01

Manufacturing in the factory

The timber modules are made by industrial prefabrication, precisely and in the factory hall instead of on the construction site. Uniform components and proven processes keep planning lean.

Delivery and assembly02

Delivery and assembly

The modules are delivered and quickly assembled into a closed building envelope.

Interior finishing03

Interior finishing

Interior finishing, roof, facade and technical connections follow step by step.

Living04

Living

Bright apartments with warm surfaces. Sales begin once the building permit is granted.

Building shell of cross-laminated timber (CLT) with exposed timber walls and window openings

Material and standards

Solid wood, precisely processed

Solid wood modules are manufactured to exact dimensions and assembled quickly. The residential units are energy-efficient, equipped with modern building systems and can be fully dismantled.

Material
Solid wood
Manufacturing
Made to exact dimensions in the factory
Energy standard
KfW EH40, QNG
Building systems
Modern and energy-efficient
Dismantling
Can be fully dismantled
The rise of wood

Process

The process of an arcneo residential project

Six steps, from the site review to repayment to the investors.

  1. 01

    Project acquisition

    Identification of suitable sites and thorough due diligence on building rights and economic viability before the plot is put under contract.

  2. 02

    Financing

    The project financing is made up of capital from investors via the arcneo bond and a construction loan from our partner banks.

  3. 03

    Production of the modules

    The 2D and 3D timber modules are industrially prefabricated once the plot is under contract and building rights have been created.

  4. 04

    Apartment sales

    Sales begin once the building permit is granted. Even at the planning stage, we make sure the space is used well for sale and letting.

  5. 05

    Delivery and assembly

    The modules are delivered to the construction site and assembled quickly. Interior finishing, roof, facade and technical connections follow.

  6. 06

    Repayment

    The capital is repaid to investors and banks after the sale of the residential units, planned within 24 months.

Project review

How we review projects

Every project is reviewed thoroughly before issuance and only offered for subscription once building rights exist and access to the plot has been settled. Volker Bredler is responsible for the groundwork.

Interview4:42

Volker BredlerProject development and project management, Real Estate Team

Chapters of the interview

Contact

Serial residential construction, predictably financed

Talk to our team about the building concept, our projects and the financing. We will show you documents and current project information.

  • Personal conversation with the team
  • Documents and project information
Planted path between residential buildings with timber facades